亚洲欧洲国产愉拍图片|亚洲成色在线综合网站|久久精品老熟妇人妻毛片|国产成人精品系列在线观看|国产视频一二亚洲国产二区|亚洲国产乱码一区二区三区|久艾草国产成人综合在线视频|国产精品福利在线观看免费不卡

HOT PRODUCTS: Neutral detergent E061|

季小姐:18929127909 | 張先生:18922975630

PA series of bottom water PA series of bottom water

PA series of bottom water...

PP Water Series PP Water Series

PP Water Series...

Water Series UV rework Water Series UV rework

Water Series UV rework...

UV Series metal bottom water UV Series metal bottom water

UV Series metal bottom water...

Cleaning agents series Cleaning agents series

Cleaning agents series...

PP bottom water PP-603B

PP bottom water PP-603B

Products

A, PP at the end of the physical properties of aquatic products: 1, chemical composition: polymer interface, Polymer 2, density (g/cm3): 0.87 (Note: <1TIN = 4LIT = 3.48kg>) 3, flash point: about 6.0 ℃. 4 Appearance: Clear transparent liquid

Two, PP at the end of fish use: PP at the end of the water used in PP plastic processing special coating on the substrate to enhance adhesion of specific additives. PP is widely used in home appliances and bottom water, commodities, advanced toys and many other aspects, in order to make products to achieve a high level in the appearance levels, the need for surface finishing, and PP plastic surface is poor, low-polarity, often adhesion poor, the need for special treatment. Such as: Flame, Corona, corrosion and other methods, but these methods are complicated, in order to reduce the process, people often access to water spray at the end of PP PP substrate, and then brushing the other coating is an effective way to , and is convenient, economical, time-saving method of paint province.

Three, PP bottom water use: 1, PP at the end of the water can be sprayed directly on the PP pieces, usually as long as the cross spray can, after construction of the PP components in the indoor air dry and then spray paint about 15min. 2, for small or complex shape of PP plastic, can be directly immersed in the work piece in water for a while the PP, PP parts removed after about 20min in the indoor air is dry spray paint. 3, after spraying the PP pieces if baked at 80 ℃, 30min, coating adhesion to the substrate can be better.

Four, PP bottom water Packing: 15kg / drum 25kg / drum 180kg / drum

Five, PP bottom water Note: 1, Avoid contact with eyes or skin, such as inadvertently stained, with plenty of water and soap and water, if necessary, seek immediate medical attention. 2, the product shelf life is 12 months, should be stored in a cool (30 ℃ or less) dark place, well-ventilated place away from sources of ignition. 3, the product promptly after opening sealed in order to avoid failure.

Previous | Next

Location:HOME >> PP Water Series

CopyRight 2011, All Rights Reserved TEL:0769-2242 6940 FAX:0769-2242 6941 EMAIL:dgnccy@163.com AliID:dgjiongsheng
MOB:Miss Ming:189 2912 0960 /Miss Qiu:180 2519 1157 / Miss Ji:189 2912 7909 Designed by L-KING
成安县| 昌江| 靖远县| 余干县| 宜昌市| 伊春市| 葵青区| 阆中市| 横峰县| 西乡县| 孟津县| 利辛县| 和田市| 平乡县| 洛宁县| 甘洛县| 曲松县| 莲花县| 兴山县| 天津市| 台南县| 桑日县| 娱乐| 昌江| 大理市| 吉木乃县| 门头沟区| 密云县| 江川县| 长汀县| 东明县| 西丰县| 夹江县| 静安区| 梓潼县| 长白| 正镶白旗| 丰县| 乾安县| 莆田市| 桃源县|